Boilers and pressure vessels to conform to rules, exceptions.
650.220. No power boiler, low pressure boiler or pressure vessel which
does not conform to the rules and regulations formulated by the board
governing new construction and installation shall be installed and operated
in this state after twelve months from the date upon which the first rules
and regulations under sections 650.200 to 650.290 pertaining to new
construction and installation have become effective, unless the boiler or
pressure vessel is of a special design or construction, and is not
inconsistent with the spirit and safety objectives of the rules and
regulations, in which case a special installation and operating permit may at
its discretion be granted by the board.
(L. 1984 H.B. 1060 § 5)