Advanced Search

WAC 296-155-52901: Certification and proof load testing-Requirement


Published: 2015

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Print







WACs > Title 296 > Chapter 296-155 > Section 296-155-52901











296-155-52900    

296-155-52902







Agency filings affecting this section







WAC 296-155-52901









Certification and proof load testing—Requirement.









Effective January 1, 2010, all cranes and derricks covered in WAC 296-155-52900 and not exempt in subsection (3) of that section, must be certified and proof load tested annually by an accredited crane certifier recognized by the department.

Note:
For additional inspection criteria and proof load testing requirements for specific types of cranes, see:

 
• WAC 296-155-53202 for mobile cranes.

 
• WAC 296-155-53204 for articulating boom cranes.

 
• WAC 296-155-53206 for tower cranes.

 
• WAC 296-155-53208 for self-erecting tower cranes.

 
• WAC 296-155-53210 for overhead and bridge cranes.

 
• WAC 296-155-53212 for derricks.

[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.060, and chapter 49.17 RCW. WSR 10-14-100, § 296-155-52901, filed 7/6/10, effective 9/1/10.]