Advanced Search

Decree Of 17 December 2003 Allowing The Engineering Solldev To Operate An Electricity Production Plant

Original Language Title: Arrêté du 17 décembre 2003 autorisant la SOLLDEV Ingénierie à exploiter une installation de production d'électricité

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.

Text information




JORF No. 12 of 15 January 2004 Page 1142
Text #36


ARRETE
Order of December 17, 2003 authorizing SOLLDEV Engineering to operate an electricity generation facility

NOR: INDI0402262A ELI: http://www.legifrance.gouv.fr/eli/arrete/2003/12/17/INDI0402262A/jo/texte


By order of the Minister delegated to industry as of 17 December 2003, the company SOLLDEV Ingénierie, whose head office is located 31, rue des Bouissettes, 34070 Montpellier, is authorized to operate a wind farm with a power of 12 MW, located at the lieudit Fontanille, 07260 Sablières.


Download the document in RTF (weight < 1MB) Facsimile (format: pdf, weight < 3.5 MB) Download document to RDF (format: rdf, weight < 1MB)