Key Benefits:
REPUBLIC OF INDONESIA STATE NEWS
No. 314, 2010 MINISTRY OF ENERGY AND MINERAL RESOURCES. The fare. Power. The PT. -PLN.
REGULATION OF ENERGY MINISTER AND MINERAL RESOURCES
REPUBLIC OF INDONESIA NUMBER 7 IN 2010
ABOUT THE ELECTRIC POWER TARIFF PROVIDED BY THE COMPANY
PERSEROAN (PERSERO) PT THE COUNTRY ' S ELECTRICITY COMPANY
WITH THE GRACE OF GOD ALMIGHTY THE MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
THE DRAW: A. that in order to maintain the survival of the company, the provision of electrical power and increased quality of service to the consumer, it needs to be made adjustment of the electric power tariff provided by the Company Persero (Persero) PT Company Electricity Country;
b. that under the provisions of Article 34 of the paragraph (1) of the 2009 Invite-Invite Number of 30 Years of Fame, the Government designate the electricity tariff with the approval of the People's Representative Council of the Republic of Indonesia;
c. that in setting the tariff electric power, Government considering justice, community purchasing power, production cost and efficiency of the company, scale of the company and interconnection of the system used;
www.djpp.depkumham.go.id
2010, No. 314 2
d. that based on consideration as intended in the letter a, the letter b, and the letter c, need to establish the Regulation of the Minister of Energy and Mineral Resources about the electrical power tariff provided by the company Persero (Persero) PT Company Electricity Country;
Given: 1. Law No. 8 of 1999 on Consumer Protection (State Sheet of Indonesia in 1999 No. 42, Additional Gazette of the Republic of Indonesia Number 3821);
2. Law No. 30 Year 2009 on Fame (leaf of State of the Republic of Indonesia Year 2009 Number 133, Additional Gazette of the Republic of Indonesia Number 5052);
3. Law No. 47 of 2009 on Budget and Shopping of State of the Year 2010 (Indonesian Republic of Indonesia Year 2009 number 156, Additional Gazette of the Republic of Indonesia Number 5075) as amended by Law Number 2 Of 2010 (Sheet State Of The Republic Of Indonesia 2010 Number 69, Addition Of State Sheet Republic Of Indonesia Number 5132);
4. Government Regulation No. 10 of 1989 on Supplied and Utilization Of Electric Power (sheet Of State Of The Republic Of Indonesia 1989 Number 24, Additional Gazette Republic Indonesia Number 3395) as has been twice the last modified with Government Regulation No. 26 Of 2006 (sheet Of State Of The Republic Of Indonesia In 2006 Number 56, Additional Gazette Of The Republic Of Indonesia Number 4628);
5. Government Regulation Number 23 Of 1994 On The Diversion Of The State (perum) State Electricity Company Into The Perseroan Company (persero) (state Gazette Of The Republic Of Indonesia In 1994 Number 34);
www.djpp.depkumham.go.id
2010, No. 314 3
6. Presidential Decree No. 84 /P of 2009 dated 21 October 2009;
7. Regulation of Minister of Mines and Energy Number 02.P/451/M. PE/ 1991 dated April 26, 1991 on the Relationship of Effective Efforts of Periquagalism and the Holdholder Permit Holder For Public Interest with Society;
8. Regulation of Minister of Mines and Energy Number 03.P/451/M. PE/ 1991 dated April 26, 1991 on the Requirements of Power Linking Electricity;
9. Regulation of the Minister of Energy and Mineral Resources Number 0030 of 2005 dated July 20, 2005 on the Organization and the Working Services of the Department of Energy and Mineral Resources;
DECIDED: Establishing: REGULATION OF MINISTER OF ENERGY AND RESOURCES
MINERALS ABOUT THE ELECTRICITY POWER TARIFF PROVIDED BY THE COMPANY PERSEROAN (PERSERO) PT OF THE STATE ELECTRICITY COMPANY.
CHAPTER I OF THE GENERAL PROVISION
Article 1 In the Regulation of this Minister, referred to: 1. The electric power tariff is an electric power tariff for consumers that
is provided by the State Electric Company (Persero) PT Corporate Electricity.
2. A connection fee is the cost of a consumer candidate to obtain a power splicing, or a fee paid by the consumer for the addition of power.
3. A Subscription Guarantee is money that is a guarantee of the use of power and electrical energy as long as it becomes a consumer.
4. The Minister is the Minister who's been taking care of the affairs of the peace. 5. The Director General is the Director General whose duties and responsibilities
his answer in the field of fame.
www.djpp.depkumham.go.id
2010, No. 314 4
CHAPTER II ELECTRIC BASE FARE
Article 2
(1) The electrical power provided by the Perseroan Company (Persero) The State Electricity Company is stated in the Base Electricity Base Tarif tariff.
(2) The Electrical Base Tarif referred to the paragraph (1) consists of regular electricity rates and prepaid electricity rates.
(3) the regular electricity tarif as referred to in paragraph (2) is the electricity tariff paid after the use of electric power by the consumer.
(4) The prepaid electric tarif as referred to the paragraph (2) is the electricity tariff paid prior to the use of the power by the consumer.
Article 3
The Electrical Base Tarif as referred to in Article 2, consists of:
a. Electricity Base Rate for Social Services purposes, consists of:
1. The fare group for use is very small at low voltage, with the power of 220 VA (S-1/TR);
2. The fare group for small social services needs to be at low voltage, with power 450 VA s.d. 200 kVA (S-2/TR);
3. Fare group for large social services purposes on medium voltage, with power above 200 kVA (S-3/TM),
as set forth in Annex I;
b. Basic Electric Power fare for Household purposes, consisting of: 1. tariff rate for small household use at low voltage,
with power 450 VA s.d. 2,200 VA (R-1/TR);
2. Fare group for medium household use at low voltage, with power 3,500 VA s.d. 5,500 VA (R-2/TR);
3. Fare group for large household use at low voltage, with 6.600 VA power up (R-3/TR),
as set forth in Annex II;
www.djpp.depkumham.go.id
2010, No. 314 5
c. Electric Base Rate for Business use, consists of: 1. tariff rate for small business purposes at low voltage, with
power 450 VA s.d. 5,500 VA (B-1/TR); 2. Rate rate for medium business purposes at low voltage,
with a power of 6,600 VA s.d. 200 kVA (B-2/TR); 3. Fare group for large business purposes at intermediate voltage,
with power above 200 kVA (B-3/TM), as set forth in Annex III; d. Electricity Base Rate for Industrial use, consists of:
1. Fare group for small industrial purposes/household industry at low voltage, with power 450 VA s.d. 14 kVA (I-1/TR);
2. The tariff group for industrial purposes is at low voltage, with power over 14 kVA s.d. 200 kVA (I-2/TR);
3. Fare group for medium-sized industrial purposes at medium voltage, with power above 200 kVA (I-3/TM);
4. Fare group for large industrial purposes at high voltage, with up to 30,000 kVA upward (I-4/TT),
as set forth in Annex IV; e. Electricity Base tariff for Government and Information Office requirements
General Street, consists of: 1. tariff rate for small government office purposes and is on
low voltage, with power of 450 VA s.d. 200 kVA (P-1/TR); 2. Fare group for large government office needs at the voltage
medium, with power above 200 kVA (P-2/TM); 3. Fare class for public road illumination purposes at a voltage
low (P-3/TR), as set forth in Annex V; f. Electricity Base fare for Traction purposes at medium voltage, with
the power above 200 kVA (T/TM) for the Perseroan Company (Persero) PT Kereta Api Indonesia, as set forth in Annex VI;
g. The Basic Electrical Rate for Curah (bulk) charges at medium voltage, with the power above 200 kVA (C/TM) for
www.djpp.depkumham.go.id
2010, No. 314 6
Licensee's Workforce Permit Business Permit, as set forth in Annex VII; and
h. Electricity Base tariff for Special Service purposes at low voltage, medium voltage, and high voltage (L/TR, TM, TT), is reserved only for electrical users who require service with special quality and which is due to a variety of things not Included in the provisions of the Social, Business, Business, Industry and Government group as listed in Annex VIII;
which is an inseparable part of this Minister's Regulation. Article 4
The provisions of the implementation of regular electricity tariffs and prepaid electricity tariffs as referred to in Section 2 and Section 3 are further regulated by the Company of the State Electric Company (Persero) of the State Electricity Company.
BAB III
COST OVERUSE OF REACTIVE POWER
AND THE DESIGNATION OF "K" FACTOR
PART OF THE ELEMENT
CHARGE OF EXCESS REACTIVE POWER
SECTION 5
(1) THE ELECTRICITY BASE RATE AS REFERRED TO IN SECTION 3 APPLIES TO USE electric power factor with an average power factor each month at least 0.85 (eight Twenty-five a hundred.
(2) In terms of the average power factor every month is less than 0.85 (eighty-five per hundred), then against some of the group rates it charges the overage charge of reactive power (kVArh) as set forth in Annex I, Appendix III, Annex IV, Annex V, Attachment VI, and Annex VII of this Minister Rule.
(3) The charge of the excess reactive power consumption as referred to in paragraph (2) is applied if the use of the kVArh is recorded in 1 (one) month higher than 0.62 (sixty-two per hundred) the number of kWh in the month concerned, so that the power factor (Cos φ) averaged less than 0.85 (eighty-five per hundred).
www.djpp.depkumham.go.id
2010, No. 314 7
Second Section of the "K" Factor Redemption
Section 6 of the Company's Enterprise Board of Directors (Persero) The State Electric Company defines the magnitude of the comparison factor ("K factor") between the Peak Time Price (WBP) price and the price of the price. Outside The Peak Time (LWBP) is consistent with the local electrical power system load characteristics, and sets the time and length of the Peak Load Time (WBP) as set forth in Annex I, Annex III, Annex IV, Annex V, Attachment VI, and Appendix VII of the Regulation of this Minister and report of such assignment to the Director General.
CHAPTER IV CONNECTION fee
Part General Section 7
The candidate of the consumer who submitted the new splicing or consumer who submitted the power addition to the tariff group charge of the Connection and the Warranty Money Subscription.
The Second Part Cost Linking
Section 8 (1) The Charge Fee for new splicing or power additions
The attached electrical power to the standard network is set as set forth in Appendix IX The Regulation of this Minister.
(2) The Company of Perseroan Companies (Persero) PT Company The Power of the State may specify the cost of the Linking of the Linking Fees as set forth in Appendix IX of the Regulation of this Minister, for reasons to be accountable.
(3) In terms of prospective consumers or consumers wanting a certain level of quality, reliability, and/or aesthetic so that special network needs, then the addition of such fees becomes the burden of consumer or consumer candidates by staying in charge. The cost of the connection is as defined in paragraph (2).
www.djpp.depkumham.go.id
2010, No. 314 8
(4) The terms and conditions of the payment charge payment are further set by the Company's Enterprise Board of Directors (Persero) of the State Electricity Company.
Section 9 (1) of the Company of Perseroan (Persero) PT The State Electric Company
is required to announce the magnitude of the Connection Fee for each connection group in each service unit.
(2) The Company of Perseroan Companies (Persero) of the State Electricity Company is required to report the realization execution of power splicing to the Director General periodically every quarter.
The Third Part of the Warranty Money Subscription
Section 10 (1) The Subscription Guarantee is set at an average account charge
national 1 (one) month of the rate group. (2) The Subscription and Support of the IBM SaaS is subject to the terms of the IBM International Business Organization ("IBM SaaS"), and (2) the following terms: Electricity.
(3) The State Electric Company (Persero) Directors of the State Electricity Company may establish a lower Subscription Money from the provisions as referred to the paragraph (1) for the reasons that it can be accounted for,
(4) Directors of the Company of Perseroan (Persero) PT Corporate Electricity Board of the Company further the implementation of the Subscription and Support of the IBM SaaS, as specified in the paragraph (1), paragraph (2), and paragraph (3).
CHAPTER V COSTS DELAY PAYMENT OF ELECTRIC ACCOUNTS
AND BILLS OF AFTERSHOCKS
FEES DELAY PAYMENT OF ELECTRIC ACCOUNTS SECTION 11
(1) CONSUMERS ARE REQUIRED TO PAY AN ELECTRIC ACCOUNT BILL IN ACCORDANCE WITH THE IBM PAYMENT PROCESS. the payment set by the Company ' s Perseroan (Persero) PT Corporate Electricity.
www.djpp.depkumham.go.id
2010, No. 314 9
(2) If the consumer pays an electric account bill beyond the payment term as referred to in paragraph (1) charges delay payment of an electrical account as set forth in Annex X Rule of this Minister.
Second Part Bill Bill
Article 12 (1) Perseroan Company (Persero) PT Corporate Electricity
executing Electric Power Usage (P2TL) against consumer and non-consumer products Unauthorized use of electrical power.
(2) The use of electric power In the case of a breach of the use of an electric power, it is made up of a single. The Golongan I (P I) violation is a violation that
affects the power limit but does not affect energy measurement;
b. violation of Golongan II (P II) is a violation that affects energy measurements but does not affect the power limit;
c. The Golongan III (P III) violation is a violation that affects the power limit and affects the measurement energy; and
d. violation of Golongan IV (P IV) is a violation committed by not consumer.
Article 13 (1) Consumer and not consumer committing violation of use
electric power as referred to in Section 12 of the sanctions As a result of the event, the following is the following: a: Group I (P I) violation:
TS1 = 6 x (2 x Terconnect) x Load Cost or Minimum Account of the consumer as per the Basic Power Tarif;
www.djpp.depkumham.go.id
2010, No. 314 10
b. Violation Of Group II (P II): TS2 = 9 x 720 hrs x Power Terdial x 0.85 x per kWh the highest rate of consumer fare in the consumer fare group according to the Basic Power Tarif;
c. Violation Of Group III (P III):
TS3 = TS1 + TS2;
d. Violation of Group IV (P IV): TS4 = {9 x (2 x Power Multiplier) X Cost Load or minimum consumer account according to the Basic Power of Electricity} + {9 x 720 hours x Power x 0.85 x The Highest Tarif on the tariff group according to the calculated Electric Base Tarif It's based on the Power of Power.
(3) Terms of use of the use of electric power and aftershocks as referred to in paragraph (1) and paragraph (2) are further regulated by the Company of the Company (Persero) of the State Electricity Company and authorized by the Director General.
BAB VI
LEVEL OF SERVICE QUALITY
Section 14
(1) Corporate Electricity Board of Directors (Persero) of the State Electricity Company is required to increase and announce the quality of service for each unit service at each start of the quarter.
(2) If the quality of the quality of the service in each service units as referred to in paragraph (1) among others relating to long interruption, number of interruptions, and/or meter reading errors cannot be met, then the Perseroan Company (Persero) PT of the State Electricity Company is required to provide the reduction of the electricity bill to the concerned consumer, which is taken into account in the electricity bill the following month.
(3) The provisions concerning the quality of the service quality and the reduction of the electricity bill as referred to in paragraph (1) and verse (2) is further regulated by the Director General on behalf of the Minister.
www.djpp.depkumham.go.id
2010, No. 314 11
BAB VII
COACHING AND SUPERVISION
Section 15
The Director General conducts coaching and oversight of the implementation of this Ministerial Regulation, including coaching and oversight of:
A. increased efficiency of the company; b. improving the quality and reliability of the provision of electrical power; and c. increased service to the consumer.
Article 16 Further provisions are required for the implementation of the Regulation of this Minister arranged by the Director General on behalf of the Minister.
BAB VIII CLOSING provisions
Article 17 At the time the Minister ' s Ordinance came into effect: 1. Decision of the Minister of Energy and Mineral Resources No. 2038
K/40/MEM/2001 dated August 24, 2001 on the Cost of Forcing Electric Power provided by the Perseroan Company (Persero) PT Corporate Electricity Company; and
2. Decision of the Minister of Energy and Mineral Resources No. 1616 K/36/MEM/2003 dated December 31, 2003 on the Terms of Implementation Of The Electricity Sale Price of 2004 Provided by the Company Perseroan (Persero) PT Of The State Electric Company,
revoked and specified does not apply. Article 18
The Regulation of the Minister came into force on 1 July 2010.
www.djpp.depkumham.go.id
2010, No. 314 12
For everyone to know it, ordered the invitational of the Minister's Ordinance with its placement in the News of the Republic of Indonesia.
Specified in Jakarta on 30 June 2010 MINISTER OF ENERGY AND MINERAL RESOURCES REPUBLIC OF INDONESIA,
DARWIN ZAHEDY SALEH
PROMULRED IN JAKARTA ON 30 JUNE 2010 MINISTER OF LAW AND HUMAN RIGHTS REPUBLIC OF INDONESIA, PATRIALIST AKBAR Dr. M. Iman Santoso
www.djpp.depkumham.go.id
2010, No. 314 13
ANNEX I REGULATIONS MINISTER OF ENERGY AND MINERAL RESOURCES NUMBER: 07 2010 DATE: 30 June 2010
BASIC ELECTRICAL FARE FOR SOCIAL SERVICES PURPOSES
NO. -GOL. POWER LIMIT
REGULAR PRE-PAID
(Rp/kWh) LOAD CHARGE (Rp/kVA/months)
USAGE CHARGES (Rp/kWh) AND KVArh (Rp/kVArh)
1 COST. S-1/TR 220 VA-Abonemen per month (Rp): 14,800-2.
S-2/TR 450 VA 10,000
Block I: 0 s.d. 30 kWh: 123 Block II: above 30 kWh s.d. 60 kWh: 265 Block III: above 60 kWh: 360
325
3.
S-2/TR 900 VA 15,000
Block I: 0 s.d. 20 kWh: 200 Block II: above 20 kWh-s.d. 60 kWh: 295 Block III: above 60 kWh: 360
455
4. S-2/TR 1,300 VA *) 605 605 5. S-2/TR 2,200 VA *) 650 650 6.
S-2/TR 3,500 VA s.d.
200 kVA
*) 755 755
7. S-3/TM above 200 kVA
**) Block WBP = K x P x 605 Block LWBP = P x 605 kVArh = 650 ***)
-
Note: *) Applied Minimum Account (RM): RM1 = 40 (Clock Flame) x Power connected (kVA) x Usage Charges. **) Applied Minimum Account (RM): RM2 = 40 (Clock Flame) x Power connected (kVA) x Use of LWBP Block Usage Charges. Flash hours: kWh per month is shared with kVA connected. **) The cost of excess reactive power consumption (kVArh) is imposed in terms of the average power factor every month
less than 0.85 (eighty-five per hundred). K: A comparison factor between the price of WBP and LWBP corresponds to the system load characteristic
local electricity (1.4 ≤ K ≤ 2), set by the Company's Board of Directors (Persero) PT Corporate Electricity Company.
P: The multiplier factor for The differentiator between S-3 is purely social with S-3 is commercial social.
For the purely social S-3 customers P = 1. For S-3 customers, commercial social P = 1.3. The S-3 category is purely social and the S-3 is commercial social established by the Company's Enterprise Electricity Company (Persero), the State Electricity Company, which considers the ability to pay and the nature of its business. WBP: Peak Load Time. LWBP: Outer LOAD TIME.
MINISTER OF ENERGY AND MINERAL RESOURCES, DARWIN ZAHEDY SALEH
www.djpp.depkumham.go.id
2010, No. 314 14
ANNEX II REGULATIONS MINISTER OF ENERGY AND MINERAL RESOURCES NUMBER: 07 2010 2010 DATE: 30 June 2010
BASIC ELECTRICAL TARIFFS FOR HOUSEHOLD PURPOSES
NO. -GOL. POWER LIMIT
REGULAR PRE
PAY (Rp/kWh)
LOAD COSTS (Rp/kVA/months)
USAGE CHARGES (Rp/kWh)
1.
R-1/TR 450 VA 11,000
Block I: 0 s.d. 30 kWh: 169 Block II: above 30 kWh-s.d. 60 kWh: 360 Block III: above 60 kWh: 495
415
2.
R-1/TR 900 VA 20,000
Block I: 0 s.d. 20 kWh: 275 Block II: above 20 kWh s.d. 60 kWh: 445 Block III: above 60 kWh: 495
605
3. R-1/TR 1,300 VA *) 790 790 4. R-1/TR 2,200 VA *) 795 795 5.
R-2/TR 3,500 s.d 5,500 VA
*) 890 890
6. R-3/TR 6.600 VA to the top
**) Block I: H1 x 890 Block II: H2 x 1.380
1.330
Note: *) Applied Minimum Account (RM): RM1 = 40 (Clock Flame) x Power connected (kVA) x Usage Charges. **) Applied Minimum Account (RM): RM2 = 40 (Flash Clock) x Power connected (kVA) x Usage of Usage Block I. On flame: kWh per month is shared with kVA connected.
H1: Percentage Limit save on average national x power clock connected (kVA). H2: electric usage (kWh)-H1.
Large percentage of the average frugality and average flash hours are set by the Company's Directors of Persero (Persero) PT of the State Electricity Company with the approval of the Minister of Energy and Mineral Resources.
MINISTER OF ENERGY AND RESOURCES MINERALS, DARWIN ZAHEDY SALEH
www.djpp.depkumham.go.id
2010, No. 314 15
ANNEX III REGULATIONS MINISTER OF ENERGY AND MINERAL RESOURCES NUMBER: 07 2010 2010 DATE: 30 June 2010
BASIC ELECTRICAL TARIFFS FOR BUSINESS PURPOSES
MINISTER OF ENERGY AND MINERAL RESOURCES, DARWIN ZAHEDY SALEH
NO. -GOL. REGULAR POWER LIMIT FARE
PAY (Rp/kWh)
LOAD COSTS (Rp/kVA/months)
USAGE CHARGES (Rp/kWh) AND KVArh (Rp/kVArh)
1 COST.
B-1/TR 450 VA 23,500 Block I: 0 s.d. 30 kWh: 254 Block II: above 30 kWh: 420
535
2.
B-1/TR 900 VA 26,500
Block I: 0 s.d. 108 kWh: 420 Block II: above 108 kWh: 465
630
3. B-1/TR 1,300 VA *) 795 795 4.
B-1/TR 2,200 VA s.d. 5,500 VA
*) 905 905
5.
B-2/TR 6.600 VA s.d. 200 kVA
**)
Block I: H1 x 900 Block II: H2 x 1.380
1,100
6.
B-3/TM over 200 kVA ***) WBP Block = K x 800 Block LWBP= 800 kVArh = 905 ****)
-
Note:
*) Applied Minimum Account (RM):
RM1 = 40 (Clock Flame) x Power connected (kVA) x Usage Charges.
**) Minimum Account Applied (RM):
RM2 = 40 (Flash Clock) x Power connected (kVA) x Fee Use Block I.
***) applied minimum account (RM):
rM3 = 40 (Ap) x Power connected (kVA) x The LWBP Usage Charges.
Hours of flame: kWh per month is shared with kVA connected.
H1: Percentage of frugal limits on average national x power connected power (kVA).
H2: Electrical use (kWh)-H1.
****) The cost of excess reactive power consumption (kVArh) is worn in terms of the average power factor each month is less than 0.85 (eighty-five per hundred).
Large percentage of the average frugality and average flash hours are set by the Company's Board of Directors (Persero) PT Corporate Electric Company with the approval of the Minister of Energy and Mineral Resources.
K: The comparative factor between the price of WBP and LWBP in accordance with the characteristics of the local electrical system load (1.4 ≤ K ≤ 2), set by the Company's Board of Directors (Persero) PT Corporate Electric Company.
WBP: Time Load Peak.
LWBP: Out of Time Load Peak.
www.djpp.depkumham.go.id
2010, No. 314 16
ATTACHMENT IV REGULATIONS MINISTER OF ENERGY AND MINERAL RESOURCES NUMBER: 07 2010 2010 DATE: June 30, 2010
THE BASIC ELECTRICAL TARIFFS FOR INDUSTRIAL PURPOSES
NO. -GOL. POWER LIMIT
REGULAR PRE PAY
(Rp/kWh) LOAD CHARGE (Rp/kVA/months)
USAGE CHARGES (Rp/kWh) AND KVArh FEES (RP/KVARH)
www.djpp.depkumham.go.id
2010, No. 314 17
MINISTER OF ENERGY AND MINERAL RESOURCES, DARWIN ZAHEDY SALEH
1.
I-1/TR 450 VA 26,000 Block I: 0 s.d. 30 kWh: 160 Block II: above 30 kWh: 395
485
2.
I-1/TR 900 VA 31,500 Block I: 0 s.d. 72 kWh: 315 Block II: above 72 kWh: 405
600
3. I-1/TR 1,300 VA *) 765 765 4. I-1/TR 2,200 VA *) 790 790 5. I-1/TR 3,500 VA s.d.
14 kVA *) 915 915
6.
I-2/TR above 14 kVA s.d. 200
kVA
**) Block WBP = K x 800 Block LWBP = 800 kVArh = 875 ****)
-
7.
I-3/TM above 200 kVA
**) Block WBP = K x 680 Block LWBP = 680 kVArh = 735 ****)
-
8.
I-4/TT 30,000 kVA to top
***) WBP Block and LWBP = 605 kVArh = 605 ****)
-
Note: *) Applied Minimum Account (RM): RM1 = 40 (Clock Flame) x Power connected (kVA) x Usage Charges. **) Applied Minimum Account (RM): RM2 = 40 (Flash Clock) x Power connected (kVA) x The LWBP Usage Charges. ***) Specified Minimum Account (RM): RM3 = 40 (Flash Clock) x Power connected (kVA) x WBP and LWBP Usage Charges. Flash hours: kWh per month is shared with kVA connected. ****) The cost of excess reactive power consumption (kVArh) is worn in terms of the average power factor every month
less than 0.85 (eighty-five per hundred). K: A comparison factor between the price of WBP and LWBP corresponds to the system load characteristics
the local electricity (1.4 ≤ K ≤ 2), is designated by the Company's Enterprise Electricity Company (Persero) PT.
WBP: Time of Peak Load. LWBP: Outside The Peak Load Time.
www.djpp.depkumham.go.id
2010, No. 314 18
ANNEX V REGULATIONS MINISTER OF ENERGY AND MINERAL RESOURCES NUMBER: 07 2010
DATE: June 30, 2010
BASIC ELECTRICAL TARIFFS FOR GOVERNMENT OFFICE PURPOSES AND PUBLIC ROAD ILLUMINATION
NO. -GOL. POWER LIMIT FARE
REGULAR PRE PAY
(Rp/kWh) LOAD CHARGE (Rp/kVA/months)
COST USAGE (Rp/kWh) AND COST
KVARH (RP/KVARH) 1.
P-1/TR 450 VA 20,000 575 685
2. P-1/TR 900 VA 24,600 600 760 3. P-1/TR 1,300 VA *) 880 880 4.
P-1/TR 2,200 VA s.d. 5,500 VA
*) 885 885
5.
P-1/TR 6.600 VA s.d. 200 kVA
**) Block I: H1 x 885 Block II: H2 x 1.380
1,200
6.
P-2/TM over 200 kVA ***) WBP Block = K x 750 Block LWBP = 750 kVArh = 825 ****)
-
7.
P-3/TR-**) 820
820
Notes: *) Applied Minimum Account (RM): RM1 = 40 (Clock Flame) x Power connected (kVA) x Usage Charges. **) Applied Minimum Account (RM): RM2 = 40 (Clock Flame) x Power connected (kVA) x Fee Usage Block I ***) Applied Minimum Account (RM): RM 3 = 40 (Clock Flame) x Power connected (kVA) x The cost of LWBP's funeral.
H1: Percentage of frugal limits on average national x-power flash clock connected (kVA). H2: electric usage (kWh)-H1.
The clock is on: kWh per month is shared with kVA connected. ****) The cost of excess reactive power consumption (kVArh) is worn in terms of the average power factor of any
the month is less than 0.85 (eighty-five per hundred). A large percentage of the national average saving limit and hours of flame are set by the Company's Enterprise Electricity Company (Persero), the State Electricity Company with the approval of the Minister of Energy and Mineral Resources. K: A comparison factor between the price of WBP and LWBP corresponds to the system load characteristics
the local electricity (1.4 ≤ K ≤ 2), is designated by the Company's Enterprise Electricity Company (Persero) PT.
WBP: Time of Peak Load. LWBP: Outer LOAD TIME.
MINISTER OF ENERGY AND MINERAL RESOURCES, DARWIN ZAHEDY SALEH
www.djpp.depkumham.go.id
2010, No. 314 19
ANNEX VI REGULATIONS MINISTER OF ENERGY AND MINERAL RESOURCES NUMBER: 07 IN 2010
DATE: June 30, 2010
BASIC ELECTRICAL TARIFFS FOR TRACTION PURPOSES
NO. -GOL. LOAD COST POWER LIMIT (Rp/kVA/months)
USAGE CHARGES (Rp/kWh) AND KVArh (Rp/kVArh)
1 COST.
T/TM
above 200
kVA
25,000 *)
Block WBP = K x 390 Block LWBP = 390 kVArh = 665 * *)
Note:
*) The load charge calculation is based on the maximum monthly power measurement for:
a. Monthly maximum power > 0.5 of the connected power, load charge is charged with maximum measurable power;
b. The monthly maximum power ≤ 0.5 of the connected power, the load charge is charged 50% measured power.
**) The cost of excess reactive power consumption (kVArh) is imposed in terms of the average power factor every month less than 0.85 (eighty-five A hundred.
K: A comparison factor between the prices of WBP and LWBP in accordance with local electrical system load characteristics (1.4 ≤ K ≤ 2), set by the Company's Enterprise Electricity Company (Persero) PT.
WBP: Time of Load Peak.
LWBP: Outer Load Time.
MINISTER OF ENERGY AND MINERAL RESOURCES, DARWIN ZAHEDY SALEH
www.djpp.depkumham.go.id
2010, No. 314 20
APPENDIX VII REGULATIONS MINISTER OF ENERGY AND MINERAL RESOURCES NUMBER: 07 IN 2010
DATE: June 30, 2010
ELECTRICITY BASE RATE FOR BULK SALES PURPOSES (BULK)
NO. -GOL. LOAD COST POWER LIMIT (Rp ./kVA/month)
USAGE CHARGES (Rp/kWh) AND KVArh (Rp/kVArh)
1 COST.
C/TM
above 200 kVA
30,000
Block WBP = K x 445 LWBP Block = 445 kVArh = 595 *)
Note:
*) The cost of excess reactive power consumption (kVArh) is charged in terms of average power factor every month less from 0.85 (eighty-five per hundred).
This tarif for the purpose of the sale is subject to the Electric Power Supply-Supply Permit.
K: A comparison factor between the price of WBP and LWBP corresponds to the local electrical system load characteristics (1.4 ≤ K ≤ 2), is set by the State Electric Company's Directors (Persero) of the State Electric Company.
WBP: Peak Load Time.
LWBP: Outer loads of Peak.
MINISTER OF ENERGY AND MINERAL RESOURCES,
DARWIN ZAHEDY SALEH
www.djpp.depkumham.go.id
2010, No. 314 21
ANNEX VIII REGULATION MINISTER OF ENERGY AND MINERAL RESOURCES NUMBER: 07 2010
DATE: June 30, 2010
BASIC ELECTRICAL TARIFFS FOR SPECIAL SERVICES PURPOSES
NO. -GOL. LOAD COST POWER LIMIT (Rp/kVA/months) USAGE CHARGES
(Rp/kWh)
1.
L/TR, TM, TT
-
-
1.450 *)
Note:
Tarif for the basis of price calculation of the electrical power by which something cannot be charged according to the default tariff as set forth in Annex I, II, III, IV, V, VI, and VII of the Ordinance of this Minister, namely:
a. export import, with other power-power supply permit holders and operating permit holders;
b. A maximum of 3 (3) months, specifically for maximum construction activities of 24 (twenty-four) months and may be extended;
c. for business areas and industrial areas that require a special reliability level, or simply as supply backup;
d. For the purpose of business and industry that has a working area is distributed and wants centralized payment; or
e. the presence of mutually beneficial parties with the quality of certain services, specifically for business and industrial purposes with the power above 200 kVA.
Implementation of the implementation of the fare for the purposes of the Special Service is further specified by the Corporate Board of Directors (Persero) of the State Electricity Company.
The interest:
*) As the maximum fare.
Inside implement, this rate rate is multiplied by the multiplier "N" factor with the value of "N" no more than 1 (one).
MINISTER OF ENERGY AND MINERAL RESOURCES, DARWIN ZAHEDY SALEH
ANNEX IX REGULATIONS MINISTER OF ENERGY AND MINERAL RESOURCES
www.djpp.depkumham.go.id
2010, No. 314 22
NUMBER: 07 2010 DATE: June 30, 2010
SPLICING CHARGES
NO GROUP CONNECTION CHARGE MAXIMUM LINK
1. Junction 1 fasa or 3 fasa with power restrictions and low-line measurement measurement.
1.1. Power connected to s.d. 2,200 VA Rp 750 ,00 /VA 1.2. Power is connected above 2,200 VA s.d. 200 kVA
includes for the R-3/TR tariff group home connection with power above 200 kVA.
Rp 775 .00 /VA
2. 3-phase connection with power restriction and Medium High Volt measurement with power connected above 200 kVA
Rp 505 ,00 /VA
3. 3-phase connection with power restrictions and High Volt measurement with a connecting power of 30,000 kVA to the top.
Rp 395 ,00 /VA
4. The 1 phase connection with power restrictions and low-point stretch measurement in customer building.
4.1. Special Fare S-1/TR s.d. 220 VA.
4.2. For the addition of the power of the S-1/TR (no meters) fare group to 450 VA or 500 VA (with meters).
Rp 60,000 ,00 /junction
Free Charge Fee
MINISTER OF ENERGY AND MINERAL RESOURCES, DARWIN ZAHEDY SALEH
www.djpp.depkumham.go.id
2010, No. 314 23
ATTACHMENT X REGULATIONS MINISTER OF ENERGY AND MINERAL RESOURCES NUMBER: 07 2010 2010 DATE: 30 June 2010
FEES DELAY PAYMENT OF ELECTRIC ACCOUNTS
NO LIMIT ON COST OF DELAY
(Rp/month)
1. 450 VA 3000 2. 900 VA 3000 3. 1,300 VA 5,000
4. 2,200 VA 10,000
5. 3,500 VA s.d. 5,500 VA 50,000
6. 6,600 VA s.d. 14,000 VA 3% of the electricity account bill
(minimum Rp 75,000)
7. above 14,000 VA 3% of the electricity account bill
(minimum Rp 100,000)
MINISTER OF ENERGY AND MINERAL RESOURCES,
DARWIN ZAHEDY SALEH
www.djpp.depkumham.go.id